![]() BLACK ROCK DAM MODIFICATION - CONCEPTUAL DESIGN
FUNCTION ANALYSIS SYSTEM TECHNIQUE (FAST) DIAGRAM
HOW?
WHY?
>>==>
DESIGN OBJECTIVES
ALL THE TIME
<==<<
FACILITATE
GATHER
MAINTENANCE
RESOURCES
0.1%
2.3%
ENABLE
CONSTRUCT.
2.4%
PLACE
CONCRETE
INCREASE
RAISE
11.8%
STORAGE
EMBANKMENT
12.7%
12.7%
PLACE
BLOCKS
LIMIT
0.9%
OVERTOPPING
45.9%
PASS
PLACE
WATER
CONCRETE
| 33.2%
| 32.1%
PREVENT
CREATE
EROSION
VOID
0.6%
0.6%
PREVENT
REPLACE
EROSION
RIPRAP
0.9%
CONTROL
PLACE
SEEPAGE
MEMBRANE
28.2%
| 13.7%
CREATE
VOID
| 13.7%
PREVENT
FILL
FAILURE
VOID
95.8%
STABILIZE
| 0.1%
84.8%
*
EMBANKMENT
PROTECT
31.2%
MEMBRANE
| 3.2%
LIMIT
REMOVE
PIPING
WATER
30.3%
| 1.2%
REPLACE
RIPRAP
| 2.7%
STABILIZE
SOIL
| 0.1%
PLACE
SAVE
GEOTEXTILE
LIVES
5.9%
95.8%
SUPPORT
INSTALL
LOAD
PIPE
2.1%
| 2.1%
FILL
VOIDS
0.4%
EVACUATE
PASS
CONSTRUCT
RESERVOIR
WATER
TOWER
18.7%
18.7%
| 18.7%
| 2.2%
CREATE
VOID
| 9.2%
FILL
VOID
| 6.5%
DESTRUCT
TOWER
| 2.2%
CONTROL
DISCHARGE
| 2.2%
FACILITATE
MAINTENANCE
0.1%
WARN
INSTALL
PUBLIC
EWS
Higher Order Function
Basic Function
*
Secondary Function
Activities
EWS was not evaluated as part of this value study (EWS=11.0% additional)
H:\BACKUP\ZIPS\LAN\MAINLA~1\INTERIOR\BIA\BLACKROK\BLACFAS2.WK3
13
|