BLACK ROCK DAM MODIFICATION
VALUE ENGINEERING STUDY
COST MODEL
COMPONENT/PERCENT PROJECT COST
PROJECT COST PROPORTION
Bul1
Bul2
Bul3
Bul4
Bul5
Remaining Name
Chart Area
I.  SPILLWAY MODIFICATION
(33.2%)
**
A.  CONCRETE
  (32.1%)
**
B.  EXCAVATION
    (0.6%)
**
C.  BACKFILL
    (0.6%)
**
II. SEEPAGE CONTROL
(28.2%)
**
A.  GEOMEMBRANE
  (13.7%)
**
B.  SITE PREPARATION
    (7.5%)
**
1.  GEOTEXTILE COVER
    (5.9%)
**
2.  EXCAVATION
    (1.3%)
**
a.  RIPRAP & BEDDING
    (0.9%)
**
b.  ABUTMENTS
    (0.4%)
**
3.  FILL AND ROLL
    (0.1%)
**
4.  CLEAR AND GRUB
    (0.1%)
**
C.  MEMBRANE SOIL COVERING
    (5.9%)
**
E.  DEWATERING
    (1.2%)
**
III.  OUTLET WORKS
(20.8%)
**
A.  TOWER REPLACEMENT
  (18.7%)
**
1.  EXCAVATION
    (9.2%)
**
2.  BACKFILL
    (6.5%)
**
3.  CONCRETE
    (2.2%)
**
4.  TOWER REMOVAL
    (0.7%)
**
B.  TUNNEL LINER
    (2.1%)
**
1.  STEEL PIPE
    (1.7%)
**
2.  GROUT
    (0.4%)
**
IV.  RAISE DAM
(13.1%)
**
A.  LEFT ABUTMENT
    (6.5%)
**
1.  EARTHFILL
    (6.2%)
**
2.  SITE PREPARATION
    (0.3%)
**
B.  DAM CREST
    (6.1%)
**
1.  CONCRETE FILL
    (5.1%)
**
2.  ROCK BLOCK
    (0.9%)
**
C.  RIGHT ABUTMENT
    (0.5%)
**
1.  EARTHFILL
    (0.5%)
**
2.  SITE PREPARATION
    (0.0%)
**
V.  MOBILIZATION
  (4.7%)
**
**
10